What is ECDIS mandation? The International Maritime Organization (IMO) approved amendments to the International Convention for the Safety of Life at Sea (SOLAS) mandating the fitting of Electronic Chart Display Information System (ECDIS) at the 86th session of the Maritime Safety Committee (MSC) in June 2009. The amendment to SOLAS means that all large passenger, tanker and cargo ships will be obliged to fit ECDIS on a rolling timetable that begins in July 2012. What is the purpose of this guide? ECDIS is an evolving technology and the new regulations surrounding its mandated use can seem confusing. The purpose of this guide is to clarify the process that leads to adoption of ECDIS by shipping companies, in step with SOLAS Regulations. What is the involvement of the UKHO? The United Kingdom Hydrographic Office (UKHO) is the leading supplier of official Electronic Navigational Charts (ENCs) allowed under SOLAS Regulations. We believe that the mandation of ECDIS puts a powerful tool into the hands of seafarers that can mean safer and more efficient voyages, and at the same time help to protect the marine environment. Our own research suggests that shipowners need to start planning their strategy for the transition to ECDIS now to get the best results. Step 1 Find out how your fleet will be affected
Fitting of ECDIS will become mandatory in a rolling timetable that begins in July 2012. The legislation will be phased by vessel type and size to eventually apply to almost all large merchant vessels and passenger ships. Use the diagram to determine which of your ships will be affected and when. The timetable for newbuilds is based on the date the vessel’s keel is laid. Existing vessels will be required to fit ECDIS in advance of the first survey after the implementation date. There are no requirements for existing cargo vessels of less than 10,000 gross tons. Flag States may exempt vessels that will be taken permanently out of service within two years of the implementation date.
Step 2. Consider your implementation strategy
As well as decisions on the purchase and installation of the ECDIS equipment thought must be given to training and to the amendment of bridge procedures. Lastly but importantly is the selection of a chart service that best meets operational needs and fulfills the carriage requirements. All of these factors need to be taken into account when developing the implementation strategy for your fleet. It will depend on the types of vessel in your fleet as well as the mix of new and existing vessels and the trading pattern they operate.
Step 3. Choosing the correct ECDIS fit
The fitting of a second ECDIS or the carriage of paper charts are widely accepted as back-up that will meet requirements. Depending on your Flag State, other solutions such as the carriage of a Chart Radar or other type-approved electronic back-up may be accepted. You will need to decide whether to fit vessels with single or dual ECDIS systems. Fitting a dual system will allow a significant reduction in the paper charts carried (in some cases down to zero). If using paper charts as a back-up to a single ECDIS you are likely to require the carriage of a full (or only slightly reduced) folio. However you intend to install and operate with ECDIS, you will need to work closely with the Maritime Authority that your vessels are registered with to ensure you comply with all the requirements. For a list of Flag State back-up requirements, you can also refer to the Compendium of Flag State ECDIS requirements at www.ukho.gov.uk/2012compliance Step 4. Choose the right chart solution for you
You should be looking for a chart service that is compliant with the new regulations, provides the best coverage for your areas of operation, provides flexibility both in terms of the charts you buy and their licence periods and includes a regular update service. Look also for a chart supplier that can provide official raster navigational charts, such as ARCS, for areas where ENCs are not available. This will enable you to always navigate with official data. The Admiralty Vector Chart Service (AVCS) is the leading, fully official, fully compliant ENC service. It contains more official ENC coverage than any other service and incorporates flexible licensing and automatic updating via internet or by CD-ROM. To find out more about the Admiralty products and services available to help you transition to ECDIS visit www.ukho.gov.uk or speak to your Admiralty Distributor.
Step 5. Get your crew trained
This requirement can be met through type specific training provided by the ECDIS manufacturer. As a minimum, you should be able to satisfy your Flag State and any independent audit authorities that your crews are competent in the use of ECDIS to maintain safety of navigation. The UKHO is developing training material, including computer based packages, to assist the mariner to read and interpret ENCs with the same confidence they have with paper charts.
Step 6. Get Flag State Certification
The certificate is proof that the vessel has a type approved ECDIS, fitted in accordance with IMO requirements and an approved back-up system. You should check that your Flag State will accept the type-approval certification for the ECDIS equipment you wish to fit. Where ECDIS has been fitted this should be indicated on the record of equipment attached to the vessel’s safety equipment certificate; this will also give details of the backup that is to be used. You should also talk to your classification society and insurance / P&I club to see if they have any further specific requirements. Flag State requirements may change following the adoption of carriage requirements for ECDIS, so it will be important to remain in close contact with them.
Step 7. Demonstrate compliance for Port State Inspection
Inspections might require physical demonstrations of competency by your crew as well as evidence of inclusion of ECDIS operation procedures in your onboard safety management systems. This is in addition to basic certification described in Step 6. Some commercial operators’ vetting schemes will have similar demands and non-compliance with their requirements could put your ship off-hire.
Step 8. Co-ordinate shore-side and ship management
Successful implementation will require a re-write of your company’s safety management system, which is likely to be best achieved through structured consultation between onboard and ashore staff.
Step 9. Start now!
Step 10. The aim is safety but the result can also be efficiency
ECDIS also offers data reporting and auditing tools that can eliminate redundant practices and improve voyage planning, delivering tangible fuel savings. Early adopters will be the ones that see the advantages soonest. Visit the Information section on the UKHO website www.ukho.gov.uk for more guidelines and regular updates over the coming months.
|